Monolith Housing Solution

|

Silver & Cedar Whole-Building Airtightness Testing

Whole-Building Airtightness Testing in Mission, BC: Silver & Cedar

Apartment floors and a daycare do not behave the same way under pressure. Silver & Cedar in Mission combines both in one six-storey building: 96 homes above, and ground-floor commercial space with a daycare centre below. Monolith Housing Solutions planned, prepared, tested and documented the whole-building airtightness testing of the complete above-grade enclosure as one pressure zone.

Project Snapshot

Project: Silver & Cedar

Location: Mission, British Columbia

Building: Six-storey mixed-use, 96 residential units, amenity areas, ground-floor commercial space with a daycare centre

Excluded from boundary: Below-grade parkade

Method: Multi-point pressurization and depressurization based on ASTM E779 principles, primary result at 75 Pa

Result: 1.33 L/s·m² at 75 Pa

Aerial view of the Silver and Cedar six-storey mixed-use building in Mission

Measured result

What the Test Measured

The final figure is the average of the pressurization and depressurization regressions, normalized by the building's envelope area.

1.33

L/s·m² at 75 Pa

Normalized air leakage

6,976

m²

Envelope area

1.545

ACH at 75 Pa

Air-change rate

5

Pa criterion

Floor-to-floor uniformity met

Mixed occupancy

Why a Mixed-Use Building Needs Extra Preparation

Residential floors repeat the same suites and openings. The ground floor does not. The commercial and daycare spaces have dedicated exterior entrances, larger door and window interfaces, separate ventilation and commercial mechanical openings, all brought inside the pressure boundary.

The daycare also became the primary lower-level fan station, giving the test the airflow capacity it needed at the base of the building.

Fan layout

Seven Fans Across Six Levels

The building's height, long floorplate and mixed uses meant the fans had to be spread through the building, then adjusted from field pressure readings.

Level

Fan station

Level 1

Two Retrotec 5000 fans within the commercial daycare area

Levels 2 to 6

One fan on each residential level

Monitoring

DM32X manometers, FanTestic Pro, independent manometers on the upper floors

Blower door fan installed in a doorway with the control laptop beside it

Defining and Isolating the Boundary

  • Drawings reviewed to set the test boundary
  • Parkade, ramp and exterior stairs isolated
  • Suites, corridors, amenity, service and commercial spaces prepared
  • Access, power, shutdowns and elevators coordinated

Permanent air-barrier components were not modified to improve the result.

Verifying Even Pressure From Floor to Floor

A whole-building result is only valid if the whole building is at the test pressure. Independent manometers on the upper floors confirmed that local differences were not distorting the result.

Recorded checks stayed within the 5 Pa uniformity criterion applied to the project.

Technician reading an upper-floor manometer during the test
Bank of digital manometers wired for multi-fan control

What This Project Shows

  1. Mixed occupancies in one zone: residential, commercial and daycare tested together.
  2. Each space prepared on its own terms, from suites to daycare entrances.
  3. Uniformity verified, not assumed, with upper-floor pressure checks.

Testing a Mixed-Use Building in the Fraser Valley?

Building in Mission, Maple Ridge, Langley or elsewhere in the Lower Mainland? Monolith Housing Solutions can plan your test boundary and fan layout before the building is ready for testing.

(604) 723-1364

2030 Marine Dr, North Vancouver, BC

Contact Us

Project Media

On Site at Silver & Cedar

Fan stations, pressure monitoring and the finished building from above.

Aerial view of the Silver and Cedar six-storey mixed-use building in Mission Blower door fan installed in a doorway with the control laptop beside it Bank of digital manometers wired for multi-fan control