Large Building Airtightness Testing in Surrey: Ledgeview II

Testing one six-storey building is a coordination exercise. Testing three of them on one site, with roughly 319 homes and a shared parkade underneath, is a logistics program. Black Maple Construction retained Monolith Housing Solutions to plan, prepare, test and document the large building airtightness testing for all three buildings at Ledgeview II.

Project Snapshot

Project: Ledgeview II, Buildings 1, 2 and 3

Location: Surrey, British Columbia

Development: Three six-storey buildings, approximately 319 units, more than 25,000 m² above-grade floor area, shared parkade

Client: Black Maple Construction

Method: Multi-point pressurization and depressurization based on ASTM E779 principles, reported at 75 Pa and normalized by envelope area

Goal: A defensible result for each building's above-grade enclosure

Aerial view of the Ledgeview II six-storey residential buildings in Surrey

Test boundary

Three Buildings, Three Separate Test Zones

Each building was evaluated as its own whole-building test zone. The shared parkade sits outside the enclosure the requirement measures, so it and every other area outside the boundary were isolated. The measured airflow then represents leakage through each building's above-grade enclosure as accurately as practical.

Separate results also help the builder: if one building performs differently, the follow-up goes to the right structure instead of being averaged away.

Before testing day

Planning Before the Fans Arrive

1

Drawings and Boundaries

Architectural and mechanical drawing review, then the test boundary confirmed for each building.

2

Preparation Plans

Building-specific preparation plans and fan-station locations fixed in advance.

3

Site Coordination

Access, mechanical shutdowns, elevator operation, electrical needs and trade activity arranged before the day.

Six calibrated Retrotec blower door fans mounted in a doorway panel

Building Preparation and Temporary Sealing

  • ERV, ventilation and make-up air openings
  • Kitchen, bathroom and dryer exhaust pathways
  • Elevator, shaft, stair and parkade connections
  • Roof, attic and service penetrations
  • Drains, rough-ins and temporary construction openings

Only openings that would not stay open in the finished building were sealed. Permanent air-barrier assemblies were never modified.

Equipment

Up to Nine Fans Working as One System

Distributed multi-fan systems of up to nine Retrotec 5000 fans were placed across several floors. Airflow from each fan was combined in FanTestic software, while building pressure was monitored independently between floors.

Category

Equipment used on Ledgeview II

Fans

Calibrated Retrotec 5000 blower door fans, up to nine per building

Pressure instrumentation

Retrotec DM32 and DM32X manometers, independent handheld manometers

Software

Retrotec FanTestic Pro testing and data acquisition

Control

Multi-fan control and communication equipment, exterior reference tubing

Setup and power

Temporary fan frames, custom panels, dedicated circuits and heavy-duty distribution

The Crew Behind a Multi-Building Test

A lead test operator, FanTestic control and data staff, fan-station technicians, pressure-monitoring staff and a preparation crew worked in parallel across floors.

After each test, the data was reviewed, the normalized leakage at 75 Pa calculated, and site conditions documented in a close-out report.

Monolith Housing Solutions crew in front of a multi-fan blower door setup
Test operator at the FanTestic control station during the whole-building test

What This Means for a Multi-Building Development

  1. A separate, defensible result for each building.
  2. A test of the finished enclosure, with the air barrier left untouched.
  3. Fewer delays on site, with shutdowns, elevators and trades coordinated early.
  4. Close-out ready reports, with setup and conditions documented.

Planning a Large Building Test in Surrey?

Delivering a Part 3 project in Surrey, Langley, Burnaby or anywhere in the Lower Mainland? Monolith Housing Solutions can plan the boundary, preparation and fan layout with your team well before testing day.

(604) 723-1364

2030 Marine Dr, North Vancouver, BC

Contact Us

Project Media

On Site at Ledgeview II

Fan stations, the control station and the crew during whole-building testing.

Six calibrated Retrotec blower door fans mounted in a doorway panel Monolith Housing Solutions crew in front of a multi-fan blower door setup Test operator at the FanTestic control station during the whole-building test